具体描述
| 书 名 | 市政工程消耗量定额 ZYA 1-31-2015 第六册 水处理工程 |
| 书 号 | ISBN 978-7-5182-0170-9 |
| 定 价 | 69.00 |
| 出版单位 | 中国计划出版社 |
| 标准类别 | 全国定额、其他定额 |
| 语 言 | 中文 |
| 等 级 | ***** |
| 主编部门 | 住房和城乡建设部标准定额研究所 |
| 发布部门 | 中华人民共和国住房和城乡建设部 |
《市政工程消耗量定额》共分十一个分册,分别是“册 土石方工程”、“第二册 道路工程”、“第三册 桥涵工程”、“第四册 隧道工程”、“第五册 市政管网工程”、“第六册 水处理工程”、“第七册 生活垃圾处理工程”、“第八册 路灯工程”、“第九册 钢筋工程”、“第十册 拆除工程”、“第十一册 措施项目”,本书为第六册,主要内容包括水处理工程构筑物、设备安装、措施项目。
章 水处理构筑物
第二章 水处理设备
第三章 措施项目
municipal engineering consumption quota, volume VI, water treatment engineering This book is a comprehensive compilation of consumption quotas for municipal water treatment engineering projects, designed to serve as a professional reference for project estimation, budgeting, and cost control. It adheres to the national standards and guidelines for municipal engineering, specifically referencing the ZYA1-31-2015 standard, ensuring accuracy and consistency across different projects. The content within this volume focuses on the intricate details of water treatment processes, covering a wide spectrum of construction and installation activities. It is meticulously organized to provide users with a clear and systematic approach to calculating material quantities, labor hours, and machinery usage. The primary objective is to offer a reliable and practical tool for engineers, estimators, contractors, and project managers involved in the planning and execution of water treatment facilities. Scope and Coverage: This volume delves into the specific requirements of water treatment engineering, which encompasses a range of essential processes aimed at purifying water for various uses, primarily for domestic supply and industrial applications. The consumption quotas detailed herein are applicable to a diverse array of water treatment plant components and stages. Pre-treatment Processes: This section covers the initial stages of water purification, including screening, grit removal, and sedimentation. It provides quotas for the construction of intake structures, raw water pumps, grit chambers, and primary sedimentation tanks. Detailed breakdowns for excavation, concrete works, steel reinforcement, equipment installation (pumps, screens, grit removal mechanisms), piping, and associated civil structures are included. Coagulation and Flocculation: This crucial stage involves the addition of chemicals to destabilize suspended particles. The book offers consumption quotas for the construction of chemical dosing systems, rapid mix tanks, and flocculation basins. It details the materials and labor required for tank construction, installation of mixers and agitators, chemical storage and handling systems, and the associated piping and instrumentation. Sedimentation/Clarification: Following flocculation, the heavier flocs settle out. This section provides quotas for the construction of secondary sedimentation tanks or clarifiers. It includes detailed information on excavation, concrete works, the installation of sludge collection mechanisms (e.g., chain and flight scrapers, belt conveyors), outlet structures, and piping for treated water and sludge removal. Filtration: This is a key process for removing remaining suspended solids. The book comprehensively covers various filtration methods, including rapid sand filters, slow sand filters, and membrane filtration systems. For rapid sand filters, it details quotas for the construction of filter beds, underdrains, media placement (gravel, sand, anthracite), backwashing systems (pumps, piping, valves), and control mechanisms. For membrane filtration, it provides quotas related to the installation of membrane modules, support structures, pre-treatment systems (if applicable), and specialized piping and control systems. Disinfection: This vital step ensures the removal of harmful microorganisms. The volume provides consumption quotas for various disinfection methods, such as chlorination, ozonation, and ultraviolet (UV) irradiation. For chlorination, it includes quotas for chlorine contact tanks, chemical feed systems, storage, and safety measures. For ozonation, it details the construction of ozone contactors, ozone generation units, and associated piping. For UV disinfection, it covers the installation of UV reactors, lamp arrays, and control systems. Sludge Treatment and Disposal: Water treatment processes generate sludge, which requires proper management. This section offers consumption quotas for various sludge thickening, dewatering, and disposal methods. It covers the construction of sludge thickening tanks, vacuum filters, belt filter presses, centrifuges, and associated piping, pumping systems, and conveyors. It also includes considerations for sludge storage and disposal infrastructure. Ancillary Structures and Systems: Beyond the core treatment processes, water treatment plants require numerous supporting facilities. This volume provides quotas for: Pumping Stations: Including raw water pumping stations, treated water pumping stations, and sludge pumping stations, covering civil works, pump installation, motor mounting, and electrical connections. Pipework and Valves: Comprehensive quotas for the installation of various types of pipes (e.g., ductile iron, PVC, steel, HDPE), fittings, and valves of different sizes and pressure ratings, including excavation for trenching, bedding, backfilling, and testing. Electrical and Instrumentation Systems: Quotas for the installation of electrical conduits, cables, switchgear, control panels, sensors, flow meters, level indicators, and other instrumentation necessary for the operation and monitoring of the water treatment plant. Building and Civil Works: Including administrative buildings, control rooms, laboratories, workshops, chemical storage facilities, and access roads, covering concrete, masonry, roofing, flooring, and finishing works. Site Preparation and Earthworks: Quotas for clearing and grubbing, excavation, embankment construction, grading, and compaction for plant layout and foundation preparation. Methodology and Structure: The consumption quotas are presented in a clear, tabular format, typically organized by work item, unit of measurement, and the specific consumption of materials, labor, and machinery. Each entry is meticulously detailed, providing precise quantities for items such as: Materials: Concrete (by strength), various types of steel reinforcement, formwork materials, piping materials (including diameter, wall thickness, and material type), valves, fittings, filter media (gravel, sand, anthracite, activated carbon), chemicals for dosing, electrical cables, conduits, etc. Labor: Different categories of skilled and unskilled labor, with estimated hours per unit of work. This includes specialized trades like masons, ironworkers, plumbers, electricians, and equipment operators. Machinery and Equipment: Details on the type and duration of use for construction equipment such as excavators, loaders, concrete mixers, cranes, vibrators, welding machines, pipe laying equipment, and testing equipment. The book emphasizes a systematic approach to estimation, breaking down complex tasks into smaller, manageable units. This allows for accurate calculation of resource requirements, enabling cost-effective project management and informed decision-making. It also promotes consistency in costing practices across the industry, facilitating fair bidding and transparent project execution. Key Features and Benefits: Comprehensive Coverage: Addresses a wide range of water treatment engineering activities, ensuring that most project requirements are met. Adherence to Standards: Based on the ZYA1-31-2015 national standard, providing a reliable and legally compliant basis for estimations. Detailed Breakdown: Offers granular information on material, labor, and equipment consumption, facilitating precise calculations. Practical Application: Designed for direct use by industry professionals, offering a user-friendly and actionable resource. Cost Control: Enables accurate budgeting and cost forecasting, contributing to effective project financial management. Efficiency Improvement: By providing standardized consumption rates, it helps optimize resource allocation and reduce waste. Professional Reference: Serves as an essential reference for students, educators, and professionals in the municipal engineering field. This volume is an indispensable tool for anyone involved in the design, construction, and management of water treatment facilities, ensuring that projects are executed efficiently, cost-effectively, and to the highest professional standards. It reflects the collective knowledge and experience in the field, providing a robust foundation for accurate and reliable project cost estimations.
对于我这种经常需要对接甲方和施工方的人来说,一本准确、权威的消耗量定额是我的“救命稻草”。这次入手的是《市政工程消耗量定额 第六册 水处理工程》,我主要是想看看它在市政雨污分流改造工程中的应用价值。我们经常遇到雨污管网的清淤、修复、新建等工程,这些工程量计算起来非常琐碎,而且涉及的材料种类繁多。我非常想知道,这本书对不同直径、不同材质的管道,其清淤、修复、敷设的定额是如何规定的?有没有考虑到顶管施工、定向钻穿越等特殊施工工艺的工程量?另外,对于污水提升泵站、截流井等构筑物的工程量,书中的描述是否清晰明了,有没有给出详细的分项计算规则?我尤其关心的是,这本书是否对一些季节性因素,比如汛期施工、冬季施工等对工程量的影响有所考虑,这对于制定合理的工期和成本非常有帮助。我希望这本书能帮助我更好地理解工程量计算的逻辑,从而在与施工单位沟通时,能够更加专业、更有底气,避免不必要的争议,也能为项目的成本控制提供更有力的保障。